ASEM has conducted pre-purchase as well pre-manufacturing equipment/machine reviews. ASEM has installed in excess of 500 million dollars worth of equipment in various manufacturing plants to ensure the equipment is installed correctly:
- Operations manuals/maintenance manuals
- Safety warning stickers and documentation
- Lockout/tagout specifics of the equipment
- Engineering controls such as:
- Light curtains
- Spill cables
- Interlocks on tool skins
- Exhaust to pull chemicals away from the employees breathing zone
- Noise
- Chemical/material compatibility
- PPE Warnings and labels